MassDOT High Crash Locations On-Call Services

Working under an on-call contract, BSC Group has been providing traffic engineering services to address high hazard locations throughout MassDOT’s District 5. Many of these projects are marked by the need to effectively manage the schedule to allow for continued project funding, with adequate time for local and state permitting, as well as MassDOT review.…Read More

Massachusetts Avenue Intersection Safety Improvements

BSC Group provided professional consulting services for improvements along Massachusetts Avenue from Pleasant Street to Marrett Road, a distance of approximately 3,500 feet. Improvements included roadway reconstruction, traffic signal upgrades, and implementation of separated bicycle lanes along both sides of the roadway. In addition to providing vehicular, bicycle, and pedestrian safety along this heavily traveled…Read More

Kneeland Street (District 6) Parking Lot Improvements

BSC Group provided engineering design services for the reconstruction of a MassDOT parking facility located at 185 Kneeland Street (District 6) in downtown Boston. The parking lot provides space for 157 vehicles. In keeping with MassDOT's "GreenDOT" implementation plan, the parking lot upgrade was designed with parking stations for plug-in hybrid vehicles as well as…Read More

Downtown Brockton Streetscape and Roadway Improvements

BSC Group provided streetscape and roadway engineering services to the City of Brockton. Improvements included street lighting and streetscape enhancements, roadway safety improvements, pedestrian way lighting underneath five commuter rail bridges, enhancements at key gateways to the city, and roadway regrinding, resurfacing and resealing. The project was designed to improve safety and help the downtown…Read More

Bolton Greenway Extension

BSC was retained by the Town of Bolton to provide surveying, assessment, planning, and design services for the extension of a 1.85-mile multi-use bicycle/pedestrian facility section of Greenway along Route 44. The first phase of this is that it will serve as an extension to the nearby Charter Oak Greenway. BSC developed a survey and…Read More

Belmont Street/Trapelo Road Reconstruction

BSC completed a comprehensive corridor study and reconstruction design for a two-mile arterial in Belmont. The project involved extensive review of traffic and pavement conditions, trackless trolley operations, and improvements to pedestrian safety, bicycle accommodations, and roadway and streetscape design. BSC worked closely with the Town to identify design deficiencies within the corridor, and as…Read More

Connecticut Riverway Trail

BSC was retained by the Town of Old Lyme to provide planning services for the proposed Connecticut Riverway Trail system within the town's shoreline area. BSC planned a four-segment trail system that traverses approximately four miles of area and is a combination Greenway-Blueway that will embrace both inland features such as wooded areas and the…Read More