MBTA Greater Boston Area

MBTA Parking Lot Improvements

BSC Group is teaming with Newport Construction to design improvements to six parking lots as part of the MBTA’s Capital Delivery acceleration program. Serving the Commuter Rail, Blue Line, and Orange Line, these stations are located in both suburban and urban settings.

Emphasizing quality design within a condensed project schedule, BSC implemented a range of improvements, including parking layout, drainage, accessibility, and overall site enhancements. BSC’s role on these projects has involved land surveying, test pits, borings, pavement cores, plan research, meetings and coordination, preliminary design, wetland delineation and permitting, final design, construction services, shop drawing review, and as-built plans. BSC prepared all wetland and environmental clearance permits to support the work at each parking facility.