Happenings

Avon High School Stadium

BSC Group provided design, engineering, bidding assistance, and construction administration services for Avon High School Athletic Facility. The project involved the conversion of the stadium’s natural grass field to a synthetic turf field along with a new running track, field events, and associated facility upgrades. The new layout accommodates a new multi-sport synthetic turf field…Read More

MBTA Parking Lot Improvements

BSC Group is teaming with Newport Construction to design improvements to six parking lots as part of the MBTA's Capital Delivery acceleration program. Serving the Commuter Rail, Blue Line, and Orange Line, these stations are located in both suburban and urban settings. Emphasizing quality design within a condensed project schedule, BSC implemented a range of…Read More

Downtown Rotary and Streetscape Improvements

BSC Group worked with the Town of Hudson to plan, design, and construct improvements to the Town's historic rotary.  This project transformed an aging, industrial downtown to a vibrant, modern civic space. A cluster of restaurants, microbreweries, and cafes has earned the Town designation as a “culinary mecca for entrepreneurial restaurateurs priced out of Boston”…Read More

Marine Park Redevelopment and Design

BSC Group is providing surveying, landscape architecture, permitting, public engagement, and conceptual design services for the redevelopment and design of DCR’s Marine Park located in South Boston, MA. This project will provide a safe, resilient, and functional memorial coastal play park and gathering area in memory of beloved child, Colin McGrath and local community activist,…Read More

Houghton’s Pond Recreation Area

Acting as a subconsultant to HKT Architects, BSC Group was responsible for permitting, erosion and sedimentation control, and stormwater management for the construction of a new bathhouse and providing universal access to DCR's Houghton’s Pond Recreation Area. BSC's responsibilities included preparing the Notice of Intent and supporting DCR in obtaining an Order of Conditions from…Read More

Hammond Pond Parkway Renovation

Assisting the Massachusetts Department of Conservation and Recreation (DCR), BSC Group is designing a full-depth roadway reconstruction of Hammond Pond Parkway in the City of Newton. The final design will achieve a total re-channelization of the corridor to implement a road diet that will include pedestrian and bicycle accommodations, as well as streetscape design elements…Read More

Horseneck Beach Campground

BSC Group was selected to provide planning and design services for improvements at the Department of Conservation and Recreation’s (DCR) Horseneck Beach Campground in Westport. The campground, which is among one of the most popular of DCR’s facilities, was in need of site-wide improvements to provide a more efficient, sustainable, resilient and enjoyable camping experience.…Read More

George Tirado Sr. Park

BSC Group was selected by the Waterbury Development Corporation (WDC) to design a new recreational facility on an abandoned five-acre property. During our previous on-call contract with Waterbury, BSC worked with city stakeholders to develop a master plan for the potential redevelopment of the Mad River Corridor, which consisted of five city-owned brownfield parcels along…Read More

Great Brook Valley Phase I Renovation

BSC supported the Worcester Housing Authority's Phase I Renovations for the Great Brook Valley Housing Complex from initial surveys through to project close out. BSC performed detailed surveys and created base mapping for approximately 4,000 L.F. of roads and parking areas within this public housing complex for the design and reconstruction of improvements throughout this…Read More

CambridgePark Drive Residential Development

BSC was selected by the Hanover Company to provide engineering services to support the construction of 50 CambridgePark Drive, a 294 unit multi-family residential complex with ground floor retail in Cambridge, MA. Prior to construction, BSC supported the project's permitting process, which included an Alewife Overlay District and Floodplain Special Permit from the Cambridge Planning…Read More
Pages: