Happenings
Municipal Vulnerability Preparedness (MVP) Grants
BSC Group, as a certified MVP provider, has assisted a number of municipalities with application preparation and program implementation of Municipal Vulnerability Preparedness (MVP) Planning Grants. Through these efforts, BSC Group has effectively supported numerous communities in the performance of vulnerability assessments and action to prepare for the impacts of climate change. Clients supported by…Read MoreEcological Resiliency Planning Project
BSC Group provided climate resiliency and ecological restoration planning services to the Mystic River Watershed Association in Medford, Arlington, and Somerville, MA. The team worked to provide MyRWA with a menu of projects that could be implemented in the future. The team identified along the four-mile segment of Mystic River large and small scale upland,…Read MoreRannapo Road Relocation
BSC Group was tasked with the stabilization of a riverbank by the relocation of an approximate 1000 feet of Rannapo Road in Sheffield, MA. The road is located along the banks of the Housatonic River, and over time the river eroded the bank and led to a section of the roadway being washed out. BSC…Read MoreMarine Park Redevelopment and Design
BSC Group is providing surveying, landscape architecture, permitting, public engagement, and conceptual design services for the redevelopment and design of DCR’s Marine Park located in South Boston, MA. This project will provide a safe, resilient, and functional memorial coastal play park and gathering area in memory of beloved child, Colin McGrath and local community activist,…Read MoreResilience Planning and Flood Protection for Two National Grid Substations
After conducting a routing study associated with the construction of a 3.7-mile underground cable between the coastal communities of Beverly and Salem, BSC Group is providing resilience planning services for the protection of two substations. BSC is leading the overall assessment and planning process, overseeing site survey and inspections, a flood modeling program, and GIS…Read MoreAthol Helping Athol Community Plan for Social Resilience
BSC Group assisted the Town of Athol in simultaneous hazard mitigation and social resilience initiatives, resulting in an action-oriented climate adaptation plan which framed vulnerabilities and solutions local to the Town. The project was made possible by BSC's assistance in the Municipal Vulnerability Preparedness (MVP) grant application process. In order to reflect the specific needs…Read MoreUrban Heat Island Assessment
BSC Group collaborated with the City of Everett to produce an Urban Heat Island Assessment for the Summary of Findings Report. Made possible by assisting the City in securing a MVP program planning grant, municipal staff and non-profits worked with the BSC team to identify and develop a broad understanding of Hazards, Vulnerabilities, as well…Read MoreMBTA Power, Communication, and Signals Vulnerability
BSC Group was chosen to join the team for the MBTA Climate Change and Vulnerability Assessment and Adaptation on-call contract. Looking at existing climate change data and reports, BSC is evaluating the applicability to MBTA's assets and integration with regional resiliency initiatives. An assessment methodology is being developed by BSC specific to the assets, assisting…Read MoreHorseneck Beach Campground Design
BSC Group was selected to provide planning and design services for improvements at the Department of Conservation and Recreation’s (DCR) Horseneck Beach Campground in Westport. The campground, which is among one of the most popular of DCR’s facilities, was in need of site-wide improvements to provide a more efficient, sustainable, resilient and enjoyable camping experience.…Read MorePages: