Happenings
Front Street District
The project aimed to incorporate a new satellite campus for the University of Connecticut within the urban fabric while maintaining the Hartford Times building, which holds significant cultural and historical value to the community. Collaborating with Robert A.M. Stern Architects, the design team envisioned a harmonious blend of greenery and structural elements, enhancing the aesthetic…Read MoreCambridge Discovery Park
BSC Group provided integrated services for The Bulfinch Companies’ Cambridge Discovery Park, a LEED-certified research and development facility with six new buildings, two new structured parking garages and a passive park. As part of the design, BSC prepared master plans for utilities, roadways, landscape, and drainage. Notably, BSC designed an innovative stormwater management system, which…Read MoreBedford Business Park
BSC civil engineers and landscape architects provided several conceptual designs for the Bedford Business Park that considered options for placement of outdoor spaces, gardens, and accessible routes connecting the buildings to exterior elements. The preferred design includes a large plaza and adjacent lawn area surrounded by a wall of evergreen trees, gardens and amenities such…Read MoreAtkins Road Subdivision
BSC designed and permitted a 23-lot residential cluster subdivision on 36.91 acres of undeveloped woodlands off Atkins Road in the Town of Sandwich. The project required permits from the Cape Cod Commission for a Development of Regional Impact (DRI), the Sandwich Planning Board (Definitive Subdivision and Special Permit) and the Natural Heritage & Endangered Species…Read MoreMCP Services
BSC Group staff provided LSP services for the remediation of a kerosene fuel oil (K-1) release from the delivery system of a jet turbine generator co-located at the electrical power substation in Pittsfield. The kerosene release occurred in January 2019 during a start-up test of the jet turbine when a fitting failed and 354 gallons…Read MoreMCP Services
BSC has been providing LSP services for four separate Release Tracking Numbers (RTNs) under the Massachusetts Contingency Plan (MCP), including site investigation and remedial activities for a variety of environmental contamination conditions. The project also involved the removal of the over 20,000 cubic yards of paper sludge from two former dewatering lagoons and a stockpile…Read MorePages:
