Happenings

Oyster Shell Park Master Plan Receives BSLA Award

The Oyster Shell Park Master Plan, developed by BSC landscape architects for the revitalization of Oyster Shell Park in Norwalk, CT, won a Merit Award in the Landscape Analysis and Planning category of the 2007 Boston Society of Landscape Architects (BSLA) Awards Program. The master plan incorporates sustainable initiatives such as renewable energy, habitat restoration,…Read More

BSC Group Secures Diverse Project Wins

In recent months, BSC has secured several new project wins including: Oyster Shell Park Design Services, Norwalk, CT - Subsequent to developing the Oyster Shell Park Master Plan, BSC has been retained to provide design services for the first phase of plan implementation. Roadway Reconstruction, Waltham, MA - The City of Waltham has selected BSC…Read More

BSC Group Welcomes New Director of Land Development

BSC has expanded its Glastonbury, CT practice with the addition of Kurt Prochorena, PE, LEP, who will serve as the Director of Land Development for Connecticut. Kurt brings to the team more than 16 years of experience as a consulting engineer, with extensive experience serving Connecticut’s public and private markets. A licensed Professional Engineer, Kurt’s…Read More

BSC is Implementing Innovative Technologies

BSC is working with Manitou Engineering of Escondido, CA, to deploy a monitoring system following slope reconstruction for a new ozone treatment facility at the Robert B. Diemer Treatment Plant in California. One of five treatment plants owned and operated by the Metropolitan Water District of Southern California (MWDSC), Diemer is located on a hilltop…Read More

ProjectInfo Wins ACEC Award

On March 7, BSC subsidiary Geonetics received the Silver Award at the American Council of Engineering Companies of Massachusetts Engineering Excellence Awards Gala Program. Geonetics submitted the ProjectInfo Fiscal Management and Project Tracking Data Management Systems project in the Special Projects category.Read More

Downtown Crossing Team Unveils Revitalization Concepts

As part of the consultant team for the City of Boston's Downtown Crossing Economic Improvement Initiative, BSC participated in the presentation of design and marketing concepts for the area to project stakeholders and City officials. The presentation marked the first public unveiling of concepts for the proposed revitalization of the area, and involved participation in…Read More

NOAA Office Relocation Receives Important Approvals

BSC has provided civil/site engineering services to client JDL Castle for the relocation of the National Oceanic and Atmospheric Administration's (NOAA) Northeast Regional Office from 1 Blackburn Drive to 55 Great Republic Drive in the recently expanded Blackburn Industrial Park in Gloucester, MA. The project has received an Order of Conditions from the Gloucester Conservation…Read More

MIT Breaks Ground on Graduate Residence Hall

Construction has started on the redevelopment of a 3.3-acre parcel into new graduate residence housing at the Massachusetts Institute of Technology (MIT). BSC has provided civil/site and utilities design, addressing grading, drainage and stormwater management; Article 19 Project Review Special Permit support; and construction phase services for the project, which entails the demolition of two…Read More

Leachmore Point Project Receives BRA Approval

The Leachmore Point mixed-use development project in South Boston has received Boston Redevelopment Authority (BRA) Board approval through the Large Project Review process with the BRA. The building will consist of a basement level of parking, a street level story featuring 5,056 sf of retail and structured parking, seven stories of condominium units (64 units)…Read More

Creative Approach to Slope Stabilization for Belle Isle Cemetery in Winthrop

BSC Group has worked with various departments, commissions and elected officials in the Town of Winthrop to stabilize an eroding landfill adjacent to the Belle Isle Marsh. The Winthrop cemetery sits atop the old landfill. The design included removal of 500 cubic yards of solid waste/soil from the marsh and beach area, installation of a…Read More
Pages: